Skip to content
Crop Calendar

Home / Planting dates / Corn / Louisiana

Corn planting and harvest dates

Corn Planting Dates in Louisiana

Usual corn planting and harvest periods in Louisiana, shown as ranges with their source. Use them to frame a plan, then adjust for your own frost dates and soil temperature.

Corn dates in Louisiana
ActivityWindowSourceLast verified
PlantingMar 13 to Apr 16 usual (most active Mar 19 to Apr 8)source2026-11-11
HarvestJul 31 to Sep 12 usual (most active Aug 9 to Sep 5)source2026-11-11
Corn calendar for Louisiana
ItemJanFebMarAprMayJunJulAugSepOctNovDec
PlantingPlanting window, most active in MarchPlanting window, most active in April
HarvestHarvest window in JulyHarvest window, most active in AugustHarvest window, most active in September

What these dates mean in Louisiana

Planting usually runs about 35 days, from Mar 13 to Apr 16.

That start date is about 32 days earlier than the middle of the 41 places in this data set that report corn planting dates (Apr 14).

Harvest usually runs about 44 days, from Jul 31 to Sep 12.

From the start of the planting window to the start of the harvest window is about 140 days in Louisiana, a rough guide to how long the crop occupies the bed or field.

Frost-date caveat: these are published ranges for Louisiana. A northern or high-elevation site will run later than a southern or low one, and a cold wet spring can push planting past the window. Frost dates and local conditions vary; NASS state-level usual dates from 20-year progress data (Oct 2010 edition), begin ~5% and end ~95% complete. Check your last spring frost and soil temperature, and confirm with your county extension office.

Related guides

Corn dates in other places

Other crops in Louisiana

Last reviewed: November 2026. Source: USDA NASS, Field Crops Usual Planting and Harvesting Dates (October 2010 edition, copy hosted by Cornell University Mann Library). Dates are the usual start and end of the period when about 5% to 95% of the crop is planted or harvested, from long-run state progress data. They are historic averages, not a forecast.